Expansion cards and backup units
7.1.4
Replacing mezzanine cards
Upgrade and Repair Units (URU)
average hardware task duration: 10 minutes
Average software task duration: 5 minutes
7.1.4.1
Required tools
Preliminary and concluding steps: tool-less
●
Replacing expansion cards: tool-less
●
7.1.4.2
Preliminary steps
V
Note on network settings recovery
When replacing network controllers or onboard CNA, network
configuration settings in the operating system will be lost and replaced
by default values. This applies to all static IP address and LAN teaming
configurations.
Ensure to note down your current network settings before replacing the
controller.
Before replacing an mezzanine card, perform the following steps:
Ê Disable BitLocker functionality as described in section
functionality" on page
Ê Disable boot watchdog functionality as described in section
watchdog functionality" on page
Ê If applicable, open the rack door as described in section
door" on page
Ê Locate the desired server blade as described in section
defective server blade" on page
Ê Shut down the server blade as described in section
server blade" on page
140
70.
54.
47.
55.
Upgrade and Maintenance Manual
71.
"Disabling BitLocker
"Disabling boot
"Opening the rack
"Locating the
"Shutting down the
BX920 S3