Waiting for XBBOX#81/XSCFU to enter ready state.
[This operation may take up to 45 minute(s)]
(progress scale reported in seconds)
0..... 30..... 60..... 90..... 120..... 150..... 180..... 210.....
240..... 270..... 300..... 330..... 360..... 390.... done
Confirm that the status of the replacement FRU is normal ("Normal"), and
then enter "f".
------------------------------------------------------------------------------
Maintenance/Replacement Menu
Status of the replaced FRU.
FRU Status
------------------- --------------
/XBBOX#81/XSCFU Normal
------------------------------------------------------------------------------
The replacement of XBBOX#81/XSCFU has completed normally.[f:finish] : f
When the maintenance menu appears, enter "c" to exit the operation.
------------------------------------------------------------------------------
Maintenance/Replacement Menu
Please select a type of model which has FRU to be replaced.
1. BB (4s Building Block Model)
2. XBBOX (XB-BOX Model)
------------------------------------------------------------------------------
Select [1,2|c:cancel] : c
6.2
Incorporating a Chassis into a Physical
Partition
Log in to the XSCF shell.
Execute the addboard command to incorporate the target chassis into the
physical partition.
Fujitsu M10-4/Fujitsu M10-4S/SPARC M10-4/SPARC M10-4S Service Manual ・ February 2014
74