Then, the following screen is displayed. Wait until the processing has completed.
Waiting for XBBOX#81/XSCFU to enter ready state.
[This operation may take up to 45 minute(s)]
(progress scale reported in seconds)
0..... 30..... 60..... 90..... 120..... 150..... 180..... 210.....
240..... 270..... 300..... 330..... 360..... 390.... done
2.
Confirm that the status of the replacement FRU is normal ("Normal"), and
then enter "f".
------------------------------------------------------------------------------
Maintenance/Replacement Menu
Status of the replaced FRU.
FRU Status
------------------- --------------
/XBBOX#81/XSCFU Normal
------------------------------------------------------------------------------
The replacement of XBBOX#81/XSCFU has completed normally.[f:finish] : f
3.
When the maintenance menu appears, enter "c" to exit the operation.
------------------------------------------------------------------------------
Maintenance/Replacement Menu
Please select a type of model which has FRU to be replaced.
1. BB (4s Building Block Model)
2. XBBOX (XB-BOX Model)
------------------------------------------------------------------------------
Select [1,2|c:cancel] : c
6.2
Incorporating a Chassis into a Physical
Partition
This section describes the procedure for incorporating a chassis into a physical
partition by using dynamic reconfiguration (DR) for the physical partition after FRU
maintenance.
1.
Log in to the XSCF shell.
2.
Execute the addboard command to incorporate the target chassis into the
physical partition.
In response to the confirmation message, enter "y".
Fujitsu M10-4/Fujitsu M10-4S/SPARC M10-4/SPARC M10-4S Service Manual ・ February 2014
74