Fujitsu SPARC M10-4 Service Manual page 99

Servers
Hide thumbs Also See for SPARC M10-4:
Table of Contents

Advertisement

Note
XSCF>   addboard -c configure -p 0 01-0
PSB#01-0   will   be   configured   into   PPAR-ID   0.   Continue?[y|n]   : y
Start   connecting   PSB   to   PPAR.   [3600sec]
0.....   30.....   60.....   90.....120.....150.....180.....210.....240.....
270.....300.....330.....360.....390.....420.....450.....480.....510.....
540.....570.....600.....630.....660.....690.....720.....750.....780.....
810.....840.....870.....900.....930.....960.....end
Connected   PSB   to   PPAR.
Start   configuring   PSB   to   Logical   Domains   (LDoms)   Manager.   [1800sec]
0.....end
Configured   PSB   to   Logical   Domains   (LDoms)   Manager.
Operation   has   completed.
Note -
Execute the showresult command to check the end status of the addboard
command that was just executed.
XSCF>   showresult
0
Execute the showboards command to confirm that the target chassis has
been incorporated into the physical partition.
XSCF>   showboards -a 
PSB     PPAR-ID(LSB)   Assignment     Pwr     Conn   Conf   Test         Fault
----   ------------   -----------   ----   ----   ----   -------   --------
00-0   00(00)               Assigned         y         y         y         Passed     Normal
01-0   00(01)               Assigned         y         y         y         Passed     Normal
Chapter 6 Understanding the Preparations for Restoring the System
75

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sparc m10-4s

Table of Contents