COMPANION 25393 Instruction Manual page 25

Table of Contents

Advertisement

2
3.
1/4 x 50,8mm Carriage
Bolts
4.
!/4 Lock nut
1. Fro t ba
r tULrriz ]e _I
2
e
1/4 50,8
inca
"ag
IFTJ..Z
III 7 7::i,
Bo,ts
3.
1/4 Lock nut
4.
Vinyl Binding
1
5.
Dump handle tube
6. Clevis pin
7.
Retainer spring
2
2
1. Top Surfaces Even
2.
Horizontal Adjustment Bracket
3.
Vertical Adjustment Bracket
6MM
(_)
To Assemble
Bagger
NOTE:
For ease of assembly, you may wish to obtain the
assistance of another person when putting the bagger to-
gether.
Assemble front and lower bagger tubes using four (4) 1/
4 x 50,Smm carriage bolts and lock nuts supplied. Tighten
securely.
Slide front and lower bagger tube assembly into the
bagger assemby.
Assemble front and upper bagger tubes using four (4) 1/
4 x 50,Smm oarraige bolts and lock nuts supplied. Tighten
securely.
Slip all the vinyl bindings over the bagger tubes
Slide the bagger dump handle through the hole in the
bagger top, install the clevis pin and secure with retainer
spring.
NOTE: For future use, the clevis pin may be removed in order
to use the handle to clear the chute in the event it has become
clogged.
Bagger adjustment
For proper bag function and appearance, it may be neces-
sary to adjust the bagger assembly. There should be 6mm (1/
4")-9mm (3/8") gap between the bagger top and fender and
the bagger top surface should be even with the top surface
of the fender. To adjust bagger position:
Horizontal
adjustment
Slightly loosen the nuts securing the bagger RH and LH
horizontal adjustment brackets. Loosen only enough so
the brackets keep their position, but allow them to be
moved.
Move the brackets the amount forward or backward you
wish the bag assembly
to move. Retighten the
nuts
securely.
Vertical
adjustment
Slightly loosen the nuts securing the vertical adjustment
brackets. Loosen only enough so the brackets keep their
position, but allow them to be moved.
Move the brackets the amount up or down you wish the
bag assembly to move. Retighten the nuts securely.
Reinstall the bagger assembly and check the bagger to
fender fit. If necessary, repeat the procedure until proper
fit is attained.
To convert
to bagging,
mulching
or discharge
See "Section
5" of this manual.
1. Handle
2.
Retainer Spring
3.
Pin
4.
Plug
25
To assemble
and install mulcher
plug
*
Remove spring retainer and pin from handle.
Insert plug into handle. Make sure that the letler "A" on
both the plug and handle are on the same side and that
they can both be seen from the top when laying on the
ground.
Secure wi!h pin and retainer spring provided. For instal-
lation see To Convert Mower" in Section 5 of this manual.

Advertisement

Table of Contents
loading

Table of Contents