In Gate Support Actuator; Removal; Installation - Epson EPL-N4000 Service Manual

Optional finisher stapler
Hide thumbs Also See for EPL-N4000:
Table of Contents

Advertisement

EPSON EPL-N4000/EPL-N4000+ Optional Finisher Stapler

3.4.83 IN Gate Support Actuator

Refer to the exploded diagram (Figure 4-46, "HCS DOC" on page 193).

3.4.83.1 Removal

1. Remove the IN Gate Support Assembly. (Refer to "IN Gate Support
Assembly" on page 128)
2. Open the latches of the Actuator and pull out the Actuator from the Shaft.

3.4.83.2 Installation

1. Place the IN Gate Actuator as shown in the Figure 3-92.
2. Push in the IN Gate Actuator to the Shaft until the latches snaps.
3. Install the IN Gate Support Assembly. (Refer to "IN Gate Support
Assembly" on page 128)
Figure 3-92. IN Gate Support Assembly
Disassembly and Assembly
Disassembly and Assembly
Revision A
129

Advertisement

Table of Contents
loading

This manual is also suitable for:

Epl-n4000+

Table of Contents