EPSON EPL-N4000/EPL-N4000+ Optional Finisher Stapler
5. Install the front metal bearing to the front end of the Shaft 1 with E ring.
6. Slide the Pulley and the Set Clamp Actuator to the rear end of the Shaft 1
and secure them to the Shaft with E ring.
7. Slide the front plastic bearing to the front end of the Shaft 2 and secure
the bearing with a screw.
8. Slide the rear plastic bearing to the rear end of the Shaft 2 and secure it
with a screw.
9. Slide the Eject Gear to the rear end of the Shaft 2 and secure it to the
Shaft with E ring.
10. Slide the Offset Lever to the rear end of the Shaft 2 and secure it to the
Shaft with E ring.
11. Install the Set Clamp Motor.(Refer to "Set Clamp Motor" on page 115)
12. Install the Eject Roll Chute to the HCS and secure the Chute with four
screws.
13. Install the Top Tray Assembly. (Refer to "Top Tray Assembly" on
page 77)
14. Install the Eject Cover. (Refer to "Eject Cover" on page 45)
Disassembly and Assembly
Disassembly and Assembly
Revision A
94