Moving the Equipment On-Site
Before moving the server, verify the status of the new site:
Is the input power ready?
-
Is it the same as the input power required for the Octel 200/300?
-
Is the installation location ready?
-
Are the telephone extensions ready to be hooked up?
-
Move the Octel 200/300 server in the vertical, upright position on the shipping pallet. Be careful and
always remember that the Octel 200/300 is delicate electronic equipment.
PB60019−01
Installation
4−3
Octel 200/300
S.4.1