Installing The Ac-Input Pem; Removing A Dc-Input Pem - Cisco 7600-SIP-400 - SPA Interface Processor 400 Installation Manual

7600 series
Hide thumbs Also See for 7600-SIP-400 - SPA Interface Processor 400:
Table of Contents

Advertisement

Chapter 5
Removal and Replacement Procedures
Figure 5-111

Installing the AC-Input PEM

Follow these steps to install an AC-input PEM:
Ensure that the system (earth) ground connection has been made. For ground connection instructions,
Step 1
see the
If necessary, remove the blank PEM filler plate (Cisco part number 800-16719-01) from the chassis PEM
Step 2
bay opening by loosening the captive installation screws. See
Grasp the PEM with one hand. Place your other hand underneath the PEM, as shown in
Step 3
Slide the PEM into the PEM bay. Make sure that the PEM is fully seated in the bay.
Step 4
Tighten the PEM captive installation screws
Plug the power cord into the PEM.
Step 5
Connect the other end of the power cord to an AC-input power source.
Step 6
Caution
In a system with dual power supplies, connect each power supply to a separate input source. In case of
a power source failure, the second source will most likely still be available.
Turn the power switch to the On (|) position on the PEM.
Step 7

Removing a DC-Input PEM

Warning
Before performing any of the following procedures, ensure that power is removed from the DC circuit.
OL-4503-26
Blank PEM Filler Plate
"System Ground Connection" section on page
3-19.
Figure
5-111.
(Figure
5-109).
Cisco 7600 Series Router Installation Guide
Removing and Replacing the PEM
Figure
5-110.
5-115

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

76037603-s760476067606-s7609 ... Show all

Table of Contents