Removing and Replacing the PEM
Remove the power cord from the power connection on the PEM. Do not touch the metal prongs
Step 3
embedded in the PEM.
Step 4
Loosen the captive installation screws
Figure 5-109
Captive installation screws
Grasp the PEM with one hand, and slide it part of the way out of the chassis. Place your other hand
Step 5
underneath the PEM, as shown in
Figure 5-110
If the PEM bay is to remain empty, install a blank PEM filler plate (Cisco part number 800-16719-01)
Step 6
over the opening, and secure it with the captive installation screws. See
Cisco 7600 Series Router Installation Guide
5-114
AC-Input PEM
IEC 60320 C15 connector
AC power switch
Handling a PEM
WS-X6K -SUP2-2 GE
CONSOLE
SUPERV ISOR2
OSM-4OC1 2 POS-SI
4 PORT OC-12 POS SM
IR
OSM-4OC1 2 POS-SI
4 PORT OC-12 POS SM
IR
(Figure
5-109).
Figure
5-110, and slide it completely out of the chassis.
Switch
Load
CONSOLE
100%
PORT
PORT 1
MODE
PCMCIA
EJECT
1%
Chapter 5
Removal and Replacement Procedures
PORT 2
Figure
5-111.
OL-4503-26
Need help?
Do you have a question about the 7600-SIP-400 - SPA Interface Processor 400 and is the answer not in the manual?
Questions and answers