Operation; Sam Boost™ Screen Layout - Idex Akron Bras SAM BOOST Operation Installation Maintenance Manual

For sam boost with smart nozzle n2p and uv780 display
Table of Contents

Advertisement

SAM BOOST™ WITH SMART NOZZLE N
It is recommended to install the water tank level transducer connector oriented between
45° to 90° from the horizontal to allow drainage and avoid sediment build-up.
Once all components have been installed, connect the SAM Boost™ Harness to the new water tank
level transducer per the System Layout Drawing (FSG-PL-01530).
o
Provide a service loop to the harness plugging into the tank level sensor.
Calibrate tank level using the Tank Level Calibration Password (08265)

6. OPERATION

The sections below detail screen functionality and general SAM Boost™ Operation
SAM BOOST™ SCREEN LAYOUT
6.1
There are 3 main operation screens in SAM Boost™ that have following functions:
1. Home Page
i. Discharge valve status
ii. Tank to pump control and status
iii. Engine Information and control.
2. Discharge Valve 1 Page
i. Discharge Valve 1 Status
ii. Discharge Valve 1 control
iii. Nozzle 1 Status
3. Discharge Valve 2 Page
i. Discharge Valve 2 Status
ii. Discharge Valve 2 control
iii. Nozzle 2 Status
Sheet: FSG-MNL-00234
INSTALLATION, OPERATING, & MAINTENANCE MANUAL
PHONE: (800) 288.1161
www.akronbrass.com
Revision 2023-08-28
P AND UV780 DISPLAY
2
Page: 33 of 66

Advertisement

Table of Contents
loading

Table of Contents