Matrix Module Installation - Idex Akron Bras SAM BOOST Operation Installation Maintenance Manual

For sam boost with smart nozzle n2p and uv780 display
Table of Contents

Advertisement

SAM BOOST™ WITH SMART NOZZLE N
Included in the SAM Boost™ Kit are placards for covering push-pull control cutouts. Place the placard over
the exposed cutouts left after removing control components for the two preconnected discharges and Tank-
to-Pump valves. For control elements where the placard cannot fully cover the cutouts, please contact
Customer Service for alternative solutions.
Before placing labels or placards, make sure the surface is thoroughly
cleaned and free of foreign materials to maximize life of the label adhesive.
5.8

MATRIX MODULE INSTALLATION

The Matrix Module assembly includes an optional mounting bracket that can be installed to either a 2.5", 3",
or 4" side discharge valve on the pump. This assembly should be installed closest to the operator panel and
within 39" of a CAN Network Hub. Follow the steps below for Matrix module installation:
Mount Matrix Module assembly to Valve
Adapter fits 2.5", 3", or 4" Valves
Connect Matrix Harness as shown on System Layout Drawing (FSG-PL-01530)
Connect Grey Matrix module connection
Connect Black Matrix module Connection.
Sheet: FSG-MNL-00234
INSTALLATION, OPERATING, & MAINTENANCE MANUAL
PHONE: (800) 288.1161
www.akronbrass.com
Revision 2023-08-28
P AND UV780 DISPLAY
2
Page: 29 of 66

Advertisement

Table of Contents
loading

Table of Contents