Sam Boost™ Tank Assembly Installation - Idex Akron Bras SAM BOOST Operation Installation Maintenance Manual

For sam boost with smart nozzle n2p and uv780 display
Table of Contents

Advertisement

SAM BOOST™ WITH SMART NOZZLE N
Locate a suitable location for pump vent to discharge into.
Install the check valve with the arrow pointed in the direction of flow from the solenoid.
Route and connect 3/8" push-on hose tubing between the two assemblies.
When routing the hose tubing, make sure to avoid kinking or bending the tubing. The
hose tubing should be routed such that it can drain naturally towards the water tank or
Tank Fill valve as to avoid freezing and damaging the tubing.
SAM BOOST™ TANK ASSEMBLY INSTALLATION
5.9.2
The SAM Boost™ Tank Assembly will require the following steps for installation:
Locate and remove the original equipment water tank level transducer.
Once this is complete, install the new assembly in its original location. The original transducer can be
installed into SAM Boost™ Tank Assembly using the fittings provided if it is still being used on the
truck separate from the SAM Boost™ System.
Sheet: FSG-MNL-00234
INSTALLATION, OPERATING, & MAINTENANCE MANUAL
PHONE: (800) 288.1161
www.akronbrass.com
Revision 2023-08-28
P AND UV780 DISPLAY
2
Page: 32 of 66

Advertisement

Table of Contents
loading

Table of Contents