Can Network Hub Installation - Idex Akron Bras SAM BOOST Operation Installation Maintenance Manual

For sam boost with smart nozzle n2p and uv780 display
Table of Contents

Advertisement

SAM BOOST™ WITH SMART NOZZLE N
It is recommended to install valve motors such that the electric connectors are oriented
downward or sideways to avoid water build-up and intrusion. If a valve motor has been
rotated, the position sensor will require calibration at the SAM Boost™ Display using
password 08266.
4" Electric Boost™ Valves are single directional and must be installed with the 250 PSI
flow arrow pointing away from the pump.
Connect to the CAN Network Hub using harness 513-00192-005.
5.6

CAN NETWORK HUB INSTALLATION

The SAM Boost™ System utilizes two preassembled CAN Network Hubs to connect all CAN enabled
components. Locating each CAN Network Hub will depend on the length of each components' harness, so
pre-planning is highly recommended. FSG-PL-01530 shows a typical layout of the SAM Boost™ System but
may not easily apply for all installations. Each hub includes a bracket for mounting with existing 7/16"
fasteners. Follow the steps below for installation of CAN Network Hubs:
Sheet: FSG-MNL-00234
INSTALLATION, OPERATING, & MAINTENANCE MANUAL
PHONE: (800) 288.1161
www.akronbrass.com
Revision 2023-08-28
P AND UV780 DISPLAY
2
Page: 25 of 66

Advertisement

Table of Contents
loading

Table of Contents