Discharge Valve Installation - Idex Akron Bras SAM BOOST Operation Installation Maintenance Manual

For sam boost with smart nozzle n2p and uv780 display
Table of Contents

Advertisement

SAM BOOST™ WITH SMART NOZZLE N
Protection should be provided in front of the antenna whip to prevent damage from trees or overhead
objects when the truck is in transit.
Refer to a certified RF Technician for installation recommendations when locating the antenna on the truck
body. Consider other radio equipment to be mounted on the vehicle.
5.4

DISCHARGE VALVE INSTALLATION

The SAM Boost™ System includes two 2" Electric Boost™ Valves programmed for use with SAM™ Smart
Nozzles that have been paired and calibrated. Follow the steps below for valve installation:
Locate the original equipment valves to be replaced.
Remove their control elements at the valve & control panel
Disconnect any gauge or drain lines at the original valves.
Unbolt and remove original valves.
Install the two 2" Electric Boost™ Valves at the original valve locations. Position the mechanical
override accessible for use in emergencies.
Torque requirements for reattaching the valve adapters are 25 – 30 FT-LBS.
o
o
If clocking the valve is required, follow instruction on AKRON BRASS manual 127903
Sheet: FSG-MNL-00234
INSTALLATION, OPERATING, & MAINTENANCE MANUAL
PHONE: (800) 288.1161
www.akronbrass.com
Revision 2023-08-28
P AND UV780 DISPLAY
2
Page: 22 of 66