Panel Components Installation; Sam Boost™ Display Installation - Idex Akron Bras SAM BOOST Operation Installation Maintenance Manual

For sam boost with smart nozzle n2p and uv780 display
Table of Contents

Advertisement

SAM BOOST™ WITH SMART NOZZLE N
It is recommended to install CAN Network Hubs such that electric connectors are
oriented downward or sideways to avoid water build-up and intrusion.
After CAN Network Hubs have been installed, connect each node harness to the CAN Network Hub
nearest to the components. Any unused connection port should remain plugged to prevent water
build-up and intrusion.
Finally, connect chassis power & ground to the CAN Network Hub assembly.
Do NOT wire to a circuit with heavy motor loads such as the Primer or Foam System.
Doing so may negatively affect overall system performance.
It is recommended to wire to a switched power source with 30 AMP protection on the
positive (+) side.
5.7

PANEL COMPONENTS INSTALLATION

SAM Boost™ System requires a SAM Boost™ Display and buzzer.
SAM BOOST™ DISPLAY INSTALLATION
5.7.1
See plate drawing FSG-PL-01530 for display overall dimensions.
The SAM Boost™ Display assembly includes a SAM Boost™ display, a buzzer (depends on order type) and
an optional panel adapter that fits existing governor cutouts without panel modifications.
Follow the steps below for SAM Boost™ Display installation:
Sheet: FSG-MNL-00234
INSTALLATION, OPERATING, & MAINTENANCE MANUAL
PHONE: (800) 288.1161
www.akronbrass.com
Revision 2023-08-28
P AND UV780 DISPLAY
2
Page: 27 of 66

Advertisement

Table of Contents
loading

Table of Contents