SAM BOOST™ WITH SMART NOZZLE N
Installation scope of work:
□
Remove original discharge valves and controls
□
Remove original tank-to-pump and controls
□
Remove original governor display (leave harness intact)
□
Mount new discharge valves w/pressure transducers
□
Mount new tank-to-pump
□
Mount new SAM BOOST™ display
□
Mount CAN Distribution Hubs
□
Mount Radio module and antenna.
□
Mount Matrix module.
□
Install new Master Pressure transducers.
□
Install new Tank level sensor
□
Install Pump vent solenoid.
□
Install all harnessing
□
Calibrate tank level
□
Calibrate Nozzle Flow.
5.1
HARNESS INSTALLATION BEST PRACTICES
Most of the SAM BOOST™ components require a harness be connected to them. Please read the best
practices listed below for optimal system performance and longevity:
□
Provide a service loop to all connections- A service loop will provide strain relief to the connector if
harness is pulled.
Zip tie harness to stationary object in such a way that it creates a flexible 2" loop (shown
o
above) behind the connector.
▪
□
Orient all Pressure transducers so they are between 45 and 90 degrees from horizontal.
o
This will guarantee that the transducers will properly drain (protect from freezing) and will
avoid the buildup of sediment.
Sheet: FSG-MNL-00234
INSTALLATION, OPERATING, & MAINTENANCE MANUAL
If loop is too tight it can have a detrimental effect by bending the seal on the
connector.
PHONE: (800) 288.1161
www.akronbrass.com
Revision 2023-08-28
P AND UV780 DISPLAY
2
Page: 18 of 66