Harness Installation Best Practices - Idex Akron Bras SAM BOOST Operation Installation Maintenance Manual

For sam boost with smart nozzle n2p and uv780 display
Table of Contents

Advertisement

SAM BOOST™ WITH SMART NOZZLE N
Installation scope of work:
Remove original discharge valves and controls
Remove original tank-to-pump and controls
Remove original governor display (leave harness intact)
Mount new discharge valves w/pressure transducers
Mount new tank-to-pump
Mount new SAM BOOST™ display
Mount CAN Distribution Hubs
Mount Radio module and antenna.
Mount Matrix module.
Install new Master Pressure transducers.
Install new Tank level sensor
Install Pump vent solenoid.
Install all harnessing
Calibrate tank level
Calibrate Nozzle Flow.
5.1

HARNESS INSTALLATION BEST PRACTICES

Most of the SAM BOOST™ components require a harness be connected to them. Please read the best
practices listed below for optimal system performance and longevity:
Provide a service loop to all connections- A service loop will provide strain relief to the connector if
harness is pulled.
Zip tie harness to stationary object in such a way that it creates a flexible 2" loop (shown
o
above) behind the connector.
Orient all Pressure transducers so they are between 45 and 90 degrees from horizontal.
o
This will guarantee that the transducers will properly drain (protect from freezing) and will
avoid the buildup of sediment.
Sheet: FSG-MNL-00234
INSTALLATION, OPERATING, & MAINTENANCE MANUAL
If loop is too tight it can have a detrimental effect by bending the seal on the
connector.
PHONE: (800) 288.1161
www.akronbrass.com
Revision 2023-08-28
P AND UV780 DISPLAY
2
Page: 18 of 66

Advertisement

Table of Contents
loading

Table of Contents