3.23 Parking the machine

3-34
Operation of slewing stabilizer blade (option 3503)
Position
Press button B
1
No
2
No
1
Yes (keep pressed)
2
Yes (keep pressed)
Setting the slewing stabilizer blade straight
Position the stabilizer blade as shown in
Slewing stabilizer blade: cleaning the slewing cylinder
In order to avoid damage, check the area around the slewing cylinder for dirt and clean it if
necessary before beginning work.
WARNING
Warning!
Crushing hazard due to machine rolling away under its own
weight after parking it!
Can cause serious injury or death.
• Press the boom and the stabilizer blade against the ground.
• Park the machine on level ground
• Secure the tracks accordingly (for example chocks)
Function
Lowers the stabilizer blade.
Raises the stabilizer blade.
Slews the stabilizer blade to the left.
Slews the stabilizer blade to the right.
Fig.
108.
OM 25-3503 us – Edition 4.1 * * 2503_3503b330.fm