Re-Equipping; Installing The Powertilt Unit; Removing The Powertilt Unit - Wacker Neuson 2503 Operator's Manual

Track excavator
Table of Contents

Advertisement

Operation

Re-equipping

Installing the Powertilt unit

H
I
J
E
G
Fig. 229: Assembly

Removing the Powertilt unit

A
B
Fig. 230: Removing
3-98
WARNING
Warning!
Injury hazard due to modification work!
Can cause serious injury or death.
• Observe the following instructions:
• Stop the engine
• Raise the control lever base
• Re-equip attachments only with suitable tools
• Do not align components with your fingers or your hands but use suita-
• Once you have re-equipped the attachments, or before starting work,
ensure that the attachment is safely locked with the stick and the tilt rod, or
with the Powertilt unit (option).
• Release the pressure
operating hydraulics on page 3-88
• Follow the safety instructions
on page 3-89
Proceed as follows:
Lower the Powertilt unit to the ground with its flat side facing down
Grease the joints and the pins before inserting them
Start the engine
Straighten the stick so that bores D and E are flush
Insert greased pin F
Install ring J and tighten the securing elements G
D
Actuate the stick cylinder until bores H and I are flush
F
Insert greased pin F
Install ring J and tighten the securing elements G
Re-equip as follows:
Lower the Powertilt unit to the ground with its flat side facing down
Stop the engine
Raise the control lever base
Remove the ring and the securing elements
First remove pin A, and then pin B. Carefully expel pins that are stuck with a hammer
and a brass punch
If pin A is stuck:
Start the engine
Slighty raise and lower the boom to take the load off the pin
Stop the engine
Raise the control lever base
ble tools – crushing hazard!
– see chapter 3.50
– see chapter 3.51
Releasing the pressure on the
Re-equipping attachments
OM 25-3503 us – Edition 4.1 * * 2503_3503b340.fm