Putting Into Operation; Safety Instructions; Putting Into Operation For The First Time; Running-In Period - Wacker Neuson 2503 Operator's Manual

Track excavator
Table of Contents

Advertisement

Operation

3.3 Putting into operation

Safety instructions

Putting into operation for the first time

Running-in period

3-8
• Only use the steps and handholds provided when entering and leaving the cabin
• Never use the controls or movable lines and cables as handholds
• Never get on a moving machine. Never jump off the machine
• Refer to the corresponding load diagrams for the boom
Important information
• The machine may only be put into operation by authorized personnel
Operator and Technician Qualifications and Basic Responsibilities on page 2-4 and
see chapter 2
Safety instructions on page 2-1 of this Operator's Manual.
• The personnel must have read and understood this Operator's Manual before putting
the machine into operation
• The machine may only be used in technically perfect condition in accordance with its
designated use and the instructions set forth in the Operator's Manual, and only by
safety-conscious persons who are fully aware of the risks involved in operating the
machine
• Go through the "Start-up" checklist in the following chapter
Handle the machine carefully during its first 50 operating hours.
The future performance and service life of the machine are heavily dependent on the
observance of the following recommendations during the running-in period.
• Do not change engine speed abruptly
• Avoid using the machine under heavy loads and/or at high speeds.
• Avoid abrupt acceleration, braking and changing travel direction.
• Do not run the engine at high speed for extended periods
• Strictly observe the maintenance schedules in the appendix
– see chapter 5.17
Maintenance plan (overview) on page 5-38
– see chapter 2.6
OM 25-3503 us – Edition 4.1 * * 2503_3503b320.fm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3503E03-04E03-07

Table of Contents