Excavating Trenches; Loading; Grading; Excavating Trenches Sideways - Wacker Neuson 2503 Operator's Manual

Track excavator
Table of Contents

Advertisement

Operation

Excavating trenches

Fig. 250: Excavating trenches

Loading

Fig. 251: Loading

Grading

Fig. 252: Grading

Excavating trenches sideways

Fig. 253: Excavating trenches sideways
3-106
• Excavating trenches is more efficient
by using a suitable bucket for this work and positioning the tracks parallel to the limit
line of the trench.
In case of large trenches, first excavate the side sections and then the center section.
• Loading in confined areas with a limited angle of rotation is more efficient
by positioning the truck so as to ensure maximum visibility for the driver of the exca-
vator.
• Loading material on trucks is easier and faster
if the hydraulic excavator is placed at the rear end of the truck and not at the sides.
• Use the stabilizer blade to fill in trenches and to grade surfaces.
Information!
Work on level ground. Grade with the stabilizer blade first in case of sloping
ground
• The machine can be used for excavating trenches sideways in confined areas
by rotating the upper carriage and swiveling the main boom (combined position and
movement of both).
OM 25-3503 us – Edition 4.1 * * 2503_3503b340.fm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3503E03-04E03-07

Table of Contents