Start Maintenance - Leica BOND-PRIME User Manual

Full y au toma ted ihc and i sh s taining s y s tem
Table of Contents

Advertisement

4.7

Start Maintenance

Use the Start maintenance procedure to access the Work Surface, clean the Bulk Reagent Containers, replace the
Suction Cup, or use the BOND-PRIME ARC Refresh Kit.
Before you start this procedure, ensure you are logged in to the processing module. Refer to
in and log
out.
BOND-PRIME User Manual, 91.7500.501 A07
Copyright © 2023 Leica Biosystems Melbourne Pty Ltd
1.
Tap Status.
2.
Check the Status screen to ensure there are:
no slides currently being processed (Processing)
l
no slides in the Preload Drawer (Loaded) and
l
Unload Drawer (Complete).
Refer to
2.3 Status
Screen.
3.
Tap Maintenance.
Chapter  4 Cleaning and maintenance
2.1 Log
127

Advertisement

Table of Contents
loading

This manual is also suitable for:

91.0021

Table of Contents