4.7
Start Maintenance
Use the Start maintenance procedure to access the Work Surface, clean the Bulk Reagent Containers, replace the
Suction Cup, or use the BOND-PRIME ARC Refresh Kit.
Before you start this procedure, ensure you are logged in to the processing module. Refer to
in and log
out.
BOND-PRIME User Manual, 91.7500.501 A07
Copyright © 2023 Leica Biosystems Melbourne Pty Ltd
1.
Tap Status.
2.
Check the Status screen to ensure there are:
no slides currently being processed (Processing)
l
no slides in the Preload Drawer (Loaded) and
l
Unload Drawer (Complete).
Refer to
2.3 Status
Screen.
3.
Tap Maintenance.
Chapter 4 Cleaning and maintenance
2.1 Log
127