Work Surface (Front View) - Leica BOND-PRIME User Manual

Full y au toma ted ihc and i sh s taining s y s tem
Table of Contents

Advertisement

1.12 Work Surface (front view)

Legend
1
1.12.1 High-Speed Robot
2
1.12.3 Wash Robots
3
1.12.4 ARC (Active Reagent Control) Modules
Bank A (rear) numbered 1-12 from left to right.
Bank B (front) numbered 13-24 from left to right
4
1.12.5 Wash/Prime Stations
Wash Stations (for Wash Robots)
BOND-PRIME User Manual, 91.7500.501 A07
Copyright © 2023 Leica Biosystems Melbourne Pty Ltd
(2)
5
1.12.5 Wash/Prime Stations
For ARC Probe on High-Speed Robot:
Standard Wash Station (rear) and
Hazardous Wash Station (front)
6
1.12.5 Wash/Prime Stations
Prime Station (for Bulk Reagent Probes)
7
1.12.6 Mixing Well Plate
8
1.12.7 Slide Preparation Station
Chapter  1 BOND-PRIME hardware
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

91.0021

Table of Contents