Move A Processing Module To A New Location - Leica BOND-PRIME User Manual

Full y au toma ted ihc and i sh s taining s y s tem
Table of Contents

Advertisement

1.15 Move a processing module to a new location

WARNING: If you need to move a processing module a long distance to a new location, notify
customer support. The processing module is very heavy. Only approved personnel should move the
processing module.
CAUTION: Do not seal the ventilation openings on the rear cover of the processing module.
Make sure there is sufficient airflow at the new location.
CAUTION: Do not use a forklift to lift a BOND-PRIME Processing Module.
If it is necessary to move a processing module only a short distance to a new location:
Disconnect the processing module. Refer to
l
Empty the waste containers. Refer to
l
Remove and clean the Sump Tray. Refer to
l
Before you attempt to move a BOND-PRIME Processing Module, use a spanner to rotate the orange gears on
l
the four wheel assemblies. Raise the central feet to allow the processing module to move freely on its wheels.
BOND-PRIME User Manual, 91.7500.501 A07
Copyright © 2023 Leica Biosystems Melbourne Pty Ltd
1.14 Disconnect the processing
4.5 Empty the Waste
Containers.
4.18 Clean the Sump
Chapter  1 BOND-PRIME hardware
module.
Tray.
56

Advertisement

Table of Contents
loading

This manual is also suitable for:

91.0021

Table of Contents