The Work Surface (Under The Hood) - Leica BOND-PRIME User Manual

Full y au toma ted ihc and i sh s taining s y s tem
Table of Contents

Advertisement

1.11 The Work Surface (under the Hood)

Legend
1
1.12.1 High-Speed Robot
1.12.3 Wash Robots
2
1.12.4 ARC (Active Reagent Control) Modules
3
Bank A (rear) numbered 1-12 from left to
l
right
Bank B (front) numbered 1-12 from left to
l
right
4
1.12.5 Wash/Prime Stations
Wash Stations (for Wash Robots)
See also:
4.14 Use the BOND-PRIME ARC Refresh Kit
l
4.7 Start Maintenance
l
5.3.3 Manually retrieve slides from ARC Modules
l
4.8 Wipe internal surface of ARC Modules
l
4.9 Wipe down Reagent Platform and ARC Bank Surfaces
l
4.13 Clean the Wash/Prime Stations
l
BOND-PRIME User Manual, 91.7500.501 A07
Copyright © 2023 Leica Biosystems Melbourne Pty Ltd
(2)
5
1.12.5 Wash/Prime Stations
For the ARC Probe on the High-Speed Robot:
Standard Wash Station (rear)
l
Hazardous Wash Station (front)
l
6
1.12.5 Wash/Prime Stations
Prime Station (for Bulk Reagent Probes)
7
1.12.6 Mixing Well Plate
8
1.12.7 Slide Preparation Station
Chapter  1 BOND-PRIME hardware
42

Advertisement

Table of Contents
loading

This manual is also suitable for:

91.0021

Table of Contents