Maintenance Schedules; Preventative Service Reminder; Cleaning And Maintenance Schedule - Leica BOND-PRIME User Manual

Full y au toma ted ihc and i sh s taining s y s tem
Table of Contents

Advertisement

4.1

Maintenance schedules

4.1.1

Preventative service reminder

When you use the BOND-PRIME Processing Module, look for leaks and worn or damaged parts. This user manual
contains instructions that tell you how to clean or replace some parts. Notify customer support if it is necessary to
repair or replace other parts.
A Leica Biosystems Melbourne Pty Ltd service engineer must regularly do preventative maintenance on the BOND-
PRIME Processing Module.
Perform preventative maintenance annually or at 20,000 slides (whichever occurs first).
4.1.2

Cleaning and maintenance schedule

Use this schedule if you stain approximately 300 slides a week on each processing module. If you stain more slides
than this, notify customer support. They can supply a customized schedule. Also refer to
maintenance.
If you stain more than 300 slides per week, do the tasks below that are marked with an asterisk more
frequently.
Daily
Examine the
Action Queue and Alert Banner
l
maintenance
as required. You should also do this whenever you return to the processing module during the
workday.
As required (ensure the processing module is connected to the BOND System
Controller)
Refill Bulk DI Water Container
l
Refill Bulk Alcohol Container
l
Refill Bulk Reagent Containers
l
Empty Waste Containers
l
Weekly
Wipe internal surface of ARC Modules
l
Wipe down Reagent Platform and ARC Bank Surfaces
l
Clean Suction Cup
l
BOND-PRIME User Manual, 91.7500.501 A07
Copyright © 2023 Leica Biosystems Melbourne Pty Ltd
on the
Status Screen
and do the applicable
4 Cleaning and
Cleaning and
110

Advertisement

Table of Contents
loading

This manual is also suitable for:

91.0021

Table of Contents