SF-S55N
6)
Remove the earth wires (4) (2 pcs.) and the
connectors (5) (5 pcs.).
7)
Remove the screws (7) (2 pcs.) to remove the
signal code plate (6).
8)
Holding the bin unit raised, turn the shaft of bin shift
motor (8) to shift all the rollers (9) to above the lead
cam (10).
9)
Raise the bin unit (11), and remove it.
Caution
Weight of bin unit: Approx. 17 kg
4−2