Tools and Equipment Needed for Installation

The ship kit for the Oracle Server X5-2 includes the following items:
Power cords, packaged separately with country kit
Rackmount kit containing rack rails and installation instructions
Miscellaneous hardware, cables, and connectors
Oracle Server X5-2 Getting Started Guide
Legal and safety documents
Related Information
"Optional Component Installation" on page 25

Tools and Equipment Needed for Installation

To install the server, you must have the following tools:
No. 2 Phillips screwdriver
ESD mat and grounding strap
In addition, you must provide a system console device, such as one of the following:
ASCII terminal
Workstation
Terminal server
Patch panel connected to a terminal server
Related Information
"Installing the Server Into a Rack" on page 39

ESD and Safety Precautions

Electronic equipment is susceptible to damage by static electricity. Use a grounded antistatic
wriststrap, footstrap, or equivalent safety equipment to prevent electrostatic discharge (ESD)
when you install or service the server.
24
Oracle Server X5-2 Installation Guide • January 2021