Tools And Equipment Needed For Installation; Esd And Safety Precautions - Oracle Server X6-2 Installation Manual

Hide thumbs Also See for Server X6-2:
Table of Contents

Advertisement

Tools and Equipment Needed for Installation

The carton contains the server and the ship kit. The ship kit for the Oracle Server X6-2 includes
the following items:
Power cords, packaged separately with country kit
Rackmount kit containing rack rails and installation instructions
Rackmount card and template
RJ-45 cross-over adapter
Miscellaneous hardware, cables, and connectors
Oracle Server X6-2 Getting Started Guide
Legal and safety documents
Related Information
"Optional Component Installation" on page 25

Tools and Equipment Needed for Installation

To install the server, you must have the following tools:
No. 2 Phillips screwdriver
ESD mat and grounding strap
In addition, you must provide a system console device, such as one of the following:
ASCII terminal
Workstation
Terminal server
Patch panel connected to a terminal server
Related Information
"Installing the Server Into a Rack" on page 37

ESD and Safety Precautions

Electronic equipment is susceptible to damage by static electricity. Use a grounded antistatic
wriststrap, footstrap, or equivalent safety equipment to prevent electrostatic discharge (ESD)
when you install or service the server.
24
Oracle Server X6-2 Installation Guide • July 2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

X6-2l

Table of Contents