Site Preparation Checklist for EX3300 Switches

Table 23: Site Preparation Checklist

Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure distance between external power
sources and switch installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of switches you
want to install.
Rack or Cabinet
Copyright © 2015, Juniper Networks, Inc.
The checklist in
Table 23 on page 55
preparing a site for EX3300 switch installation.
For More Information
"Environmental Requirements and
Specifications for EX Series Switches"
on page 59
"Power Specifications for EX3300
Switches" on page 71
"EX3300 Switches Hardware
Overview" on page 3
summarizes the tasks you need to perform when
Performed by
Date
55

Advertisement

Table of Contents
loading

Table of Contents