General Site Guidelines - Juniper EX3300 Complete Hardware Manual

Hide thumbs Also See for EX3300:
Table of Contents

Advertisement

Complete Hardware Guide for EX3300 Ethernet Switches
Table 23: Site Preparation Checklist (continued)
Item or Task
Verify that your rack or cabinet meets the
minimum requirements for the installation of
the switch.
Plan rack or cabinet location, including required
space clearances.
Secure the rack or cabinet to the floor and
building structure.
Wall
Verify that the wall meets the minimum
requirements for the installation of the switch.
Verify that there is appropriate clearance in your
selected location.
Cables
Acquire cables and connectors:
Determine the number of cables needed
based on your planned configuration.
Review the maximum distance allowed for
each cable. Choose the length of cable based
on the distance between the hardware
components being connected.
Plan the cable routing and management.
Related
Documentation

General Site Guidelines

56
For More Information
"Rack Requirements for EX3300
Switches" on page 63
"Cabinet Requirements for EX3300
Switches" on page 64
"Clearance Requirements for Airflow
and Hardware Maintenance for
EX3300 Switches" on page 66
"Requirements for Mounting an
EX3300 Switch on a Desktop or Wall"
on page 65
"Clearance Requirements for Airflow
and Hardware Maintenance for
EX3300 Switches" on page 66
General Safety Guidelines and Warnings on page 149
General Site Guidelines on page 56
Installing and Connecting an EX3300 Switch on page 81
Mounting an EX3300 Switch on page 84
This topic applies to hardware devices in the EX Series product family, which includes
EX Series switches, the EX Series Redundant Power System (RPS), and the XRE200
External Routing Engine.
This topic also applies to hardware devices in the QFX Series and to OCX1100 switches.