Etc / Throttle Body Replacement; Etc Learn Procedure - Polaris RZR XP Service Manual

2018-2019
Table of Contents

Advertisement

ETC / THROTTLE BODY REPLACEMENT

1. Remove the cargo box. Refer to Cargo Box Assembly
Removal page
.
2. Remove wire harness from ETC retainer clip
remove the ETC connector
e
3. Loosen the clamp
retaining the intake boot to the
ETC. Remove the boot from the ETC.
r
4. Remove the four bolts
to intake plenum.
5. Remove the ETC housing and gasket
plenum.
6. Reverse these steps for installation. Torque the ETC
housing retaining bolts, intake boot clamps and body
fasteners to specification.
TORQUE
ETC Housing Retaining Bolts:
7 ft-lb (10 Nm)
Intake Boot Clamp:
49 in-lb (6 Nm)
Body Fasteners:
8 ft-lb (11 Nm)
9929419 R02 - 2018-2019 RZR XP / XP 4 Turbo S Service Manual
© Copyright Polaris Industries Inc.
q
and
w
.
retaining the ETC housing
t
from intake

ETC LEARN PROCEDURE

IMPORTANT
This procedure MUST be performed on the vehicle
whenever the ECU is replaced or reflashed or the
throttle body is replaced.
1. After the reflash / ECU replacement / throttle body
change, leave the key on (engine not running) for 60
seconds. Do NOT crank the engine during this time.
2. Turn the key off and wait 3 minutes. During this time,
the ECU will write values into memory and then
completely shut down.
3. Turn key back on and start the vehicle. The vehicle
should operate normally.
4. If the procedure was interrupted at any time, start
back at step 1.
EFI / FUEL SYSTEM
4
4.43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rzr xp4 turbo s

Table of Contents