Figure 2-3
IO Config dialog box
Step 6. The USB to GPIB Configuration dialog box (Figure 2-2) appears. Check/change the
setting of the USB/GPIB interface and then click the
Step 7. In the USB to GPIB Configuration dialog box, click the
Setting the GPIB address of the equipment
The test program needs the following GPIB address for the equipment.
•
53131A Frequency Counter --- 03
•
E4419B Power Meter --- 13
•
Z5623A Dynamic Accuracy Test Set --- 12
Setting up the E4419B Power Meter
You must set up the power meter before running the performance test program.
1. Connect the power sensor you use to the power meter's channel.
•
•
2. Edit a Sensor Calibrattion Table for your power sensor. If you have already edited the
table for your power sensor, you can skip this step. Refer to the E4419B User's Guide
for further information.
3. Select the Sensor Calibration Table for your power sensor. Refer to the E4419B User's
Guide for further information.
4. Zero and calibrate the power meter. The reference calibration factor used during the
Chapter 2
Instruction for Using the Performance Test Software
8482A Power Sensor --- Connect to the channel A for testing the E5061A/E5062A
option 150/250
8483A Power Sensor --- Connect to the channel B for testing the E5061A/E5062A
option 175/275
Performance Tests
OK
button (2 in Figure 2-2).
OK
button (3 in Figure 2-3).
29