Got Installation Status Check Sheet - Mitsubishi Electric GOT SIMPLE Series Operation Manual

Hide thumbs Also See for GOT SIMPLE Series:
Table of Contents

Advertisement

GOT installation status check sheet

Check the installation status of your GOT regarding the following items.
Wiring inside
Outside the panel
Wiring of the GOT's FG cables and power lines
Countermeasures to prevent surges
Installation status
Grounding status of the control panel where the GOT is installed
Power supply system
Mark the checkboxes that apply to the current status, and take the measures if necessary.
Only when the corrective actions are taken, put a check mark in the check box of "Effective" or "Ineffective" depending on the
results of the actions.
Wiring inside
■Actual status
Power lines such as power supply cables or servo amplifier drive cables and communication cables are crossed each other in
the wiring duct in the control panel.
NFB
MC
MC
RA
RA
■Corrective action for when the cables are crossed each other
Wiring the power lines and the communication cables to keep them away from each other in the control panel will help
minimize noise interference.
NFB
MC
MC
RA
RA
Check result
□ Crossed
□ Not crossed
Result
□ Effective
□ Ineffective
34 TROUBLESHOOTING
34.1 GOT Restoration Sheets
34
403

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs25Gs21

Table of Contents