Rough Procedure - Mitsubishi Electric GOT SIMPLE Series Operation Manual

Hide thumbs Also See for GOT SIMPLE Series:
Table of Contents

Advertisement

Rough procedure

The following shows the procedures before operating a GOT and the descriptions of each item.
Install GT Designer3 in a personal computer.
Create project data.
Wire for the GOT power supply and the controller.
Wire for the controller power supply and I/O.
Turn on the power of the GOT and controller.
Install the OS to the GOT.
Check that the OS is installed to the GOT.
Download project data.
Turn on the controller power and check that the GOT
recognizes the controller.
Check that the monitoring is normal.
GT Works3 Installation Instructions
GS21 General Description
GT Designer3 (GOT2000) Screen Design Manual
19. WIRING
GOT2000 Series Connection Manual for GT Works3 Version1
Controller manuals
GT Designer3 (GOT2000) Screen Design Manual
GT Designer3 (GOT2000) Screen Design Manual
13
13 OVERVIEW
135
13.1 Features

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs25Gs21

Table of Contents