Got Installation Status Check Sheet - Mitsubishi Electric GOT SIMPLE Series Operation Manual

Hide thumbs Also See for GOT SIMPLE Series:
Table of Contents

Advertisement

GOT installation status check sheet

Check the installation status of your GOT regarding the following items.
Control panel inside wiring
Control panel outside wiring
Wiring of the FG cable and power line for the GOT
Measures against surge
Installation status
Grounding status of the control panel having the GOT
Power supply system
Mark the checkboxes that apply to the current status, and take the relevant measures if necessary.
If the measures is taken, mark the checkbox of the effect.
Control panel inside wiring
■Current status
Check if power lines, such as power cables and servo amplifier driving cables, and communication cables, such as network
cables, are mixed in the wiring duct inside the control panel.
NFB
MC
MC
RA
RA
■Measure for the mixed cables
Wiring the power lines and the communication cables inside the control panel without mixing them in the duct reduces the
influence of noise.
NFB
MC
MC
RA
RA
Check result
□ Mixed
□ Not mixed
Effect
□ Effective
□ Ineffective
11 TROUBLESHOOTING
11.1 GOT Restoration Sheets
11
109

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs25Gs21

Table of Contents