Ripple Control Line; Strain Relief - Compleo SOLO advanced AV06 Operating Instructions Manual

Table of Contents

Advertisement

5.10.5 Ripple control line

1.
Break the pre-punched cable gland out of the terminal box, deburr and insert the supplied
membrane grommets.
2.
Guide the ripple control line in the required length (max. 30 m) through the bushing in the
terminal box and secure it with the installed strain relief devices (M = 1.5 Nm).
-
Cable routing from above: Select the cable length up to the lower edge of the terminal
box.
-
Cable routing from below: Select the cable length up to the upper edge of the connection
box.
-
In the case of flush-mounted cable routing (concealed wall connection), the wall outlet
point must be 2 - 10 cm from the underside of the connection box.

5.10.6 Strain relief

1
2
Fig. 19: Strain relief
42
(1)
External supply line strain relief
(2)
Equalisation potential strain relief
(3)
Network and control line strain relief
3
A01Axxxxxx.xx | 04
2022-11

Advertisement

Table of Contents
loading

Table of Contents