External Supply Line - Compleo SOLO advanced AV06 Operating Instructions Manual

Table of Contents

Advertisement

5.10.2 External supply line

3
1
1
2
Fig. 17: Cable bushings
2022-11
1.
Push the terminal block into the centre, disengage it
from the side and - depending on the upper or lower
installation type - turn it into the required position.
Then re-engage and push to the end stop.
2.
Break the pre-punched cable gland (1) out of the
terminal box, deburr and insert the supplied
membrane grommets. If the cable is routed from
2
above, also break out and deburr the upper pre-
punched tab (3).
3.
Guide the supply line of the required length through
the grommet in the connection box and secure it with
the supplied screws (4 x 25 mm; M = 1.5 Nm) and
installed strain reliefs (2).
Cable routing from above: Select the cable length up
to the lower edge of the connection box.
Cable routing from below: Select the cable length up
to the middle of the connection box.
For flush-mounted cable routing (concealed wall
connection), the wall outlet point must be 2 - 10 cm
from the underside of the connection box.
A01Axxxxxx.xx | 04
39

Advertisement

Table of Contents
loading

Table of Contents