Installing The Pillar - Compleo SOLO advanced AV06 Operating Instructions Manual

Table of Contents

Advertisement

5.6.2

Installing the pillar

Installation material and tools
4 screws (M10 x 90, V4A) (accessory kit)
4 large diameter washers (DIN 9021 10.5 mm, V2A) (accessory kit)
Open-end or ring wrench SW 17
Torque wrench
1
Fig. 7: Supply line routing
Carrying out installation
1.
Lay the pillar flat on the ground as close as possible to the installation location.
2.
Guide prepared supply lines through the ground opening (1) of the base into the pillar and push
them through the standpipe (2) to the upper opening.
3.
Pull the supply lines out of the upper opening as far as necessary.
Fig. 8: Screw connection
30
4.
Erect the pillar and place it on the
prepared SMC base. While doing so,
carefully pull the supply lines further out of
the upper opening to avoid looping.
5.
Align the pillar so that the fixing holes are
aligned with the mounting points of the
SMC base. Check that no supply lines are
crushed!
6.
Place washers over the mounting holes of
the pillar, insert the screws through and
hand-tighten them in the threaded
bushings of the SMC base.
7.
Check the connection and the pillar for
correct fit and tighten the screws
crosswise. Observe the corresponding
tightening torques!
A01Axxxxxx.xx | 04
2
2022-11

Advertisement

Table of Contents
loading

Table of Contents