Procedure Before Operation - Fuji Electric MONITOUCH X1 Series Hardware Specifications

Table of Contents

Advertisement

4.1

Procedure before Operation

1. Mount and install the X1 series unit on the mounting panel, and perform wiring.
For details, refer to
2. Install peripheral devices, such as PLCs and temperature controllers, and perform wiring.
For wiring and setting procedures, refer to the X1 Series Connection Manual.
3. Turn on the X1 series unit power.
4. If turning on the X1 series unit for the first time, configure the initial settings.
For details, refer to
If the X1 series unit has been used before, check and change the IP address as necessary.
For details, refer to
5. If V-SFT version 6 is not installed on the computer, install it.
For details, refer to the X1 Series Setup Manual.
6. Configure a screen program and transfer the program to the X1 series unit via Ethernet.
For details on configuring screen programs, refer to the X1 Series Reference Manual.
For details on transferring screen programs, refer to the X1 Series Setup Manual.
7. Start operation.
When a connection with controllers has been established, the X1 series unit enters RUN mode.
* If the X1 series unit does not operate normally and shows an error message, refer to
error.
"3
Installation".
"4.2 Setting Procedure (For a new unit)" page
"4.3 Setting Procedure (For an existing unit)" page
4.1
Procedure before Operation
4-2.
4-3.
"6 Errors"
and eliminate the cause of the
1
2
3
4
5
6
7
8
9
10
4-1

Advertisement

Table of Contents
loading

Table of Contents