Viavi ATC-5000NG Operation Manual page 353

Atc/dme test set
Table of Contents

Advertisement

1.2
REPACKING PROCEDURE
Perform the following steps to repack the equipment for shipment
Make sure the bottom packing mold is seated on the floor of the shipping container.
Carefully wrap the Test Set with polyethylene sheeting.
Place the Test Set into the shipping container, making sure the Test Set is securely seated in the
bottom packing mold.
Place the top packing mold over the top of the Test Set and press down until the top packing mold
rests solidly on the Test Set.
Close the shipping container lids and seal with shipping tape or an industrial stapler. Tie all sides of
the shipping container with break resistant rope, twine or equivalent.
Figure 1.4.1 - 1 Repacking Procedure
1-4-1
Page 2
ATC-5000NG ATC/DME Test Set Operation Manual
Subject to Export Control. See Cover Page for details.
Shipping, Shipping Test Sets
(Figure 1.4.1 - 1
below):
Repacking Procedure
Rev. L0
February 2020

Advertisement

Table of Contents
loading

This manual is also suitable for:

138156

Table of Contents