Swing Reduction Unit Oil - Case CX130C Operator's Manual

Crawler excavator
Hide thumbs Also See for CX130C:
Table of Contents

Advertisement

Swing reduction unit oil

WARNING
Hot surface possible!
Wait for all components to cool before performing any operation.
Failure to comply could result in death or serious injury.
Replace the swing reduction unit oil every 1000 h (After 250 h of operation in run-in period).
Lubricant: H
G
YPOID
EAR
Quantity: 2.2 L (0.6 US gal).
1. Park the machine on a flat and level place. Stop the
engine, and remove the starter key.
2. Remove the oil gauge (1) and the fill plug (2). Clean
the oil gauge with a neat cloth.
3. Remove the lower panel (3).
4. Place a container with an appropriate capacity under
the upper structure frame. Remove the oil drain plug
(4) to drain oil.
NOTE: Draining oil requires a comparatively long time.
NOTE: Check the condition of the drained oil. If foreign
objects, such as metal scrapings, are included, consult the
CASE CONSTRUCTION dealer.
6 - MAINTENANCE
O
E
P
IL
XTREME
RESSURE
80W-90.
6-55
W0251A
1
SMIL15CEX9564AA
2
SMIL19CEX2632AA
3
SMIL15CEX9594AA

Advertisement

Table of Contents
loading

Table of Contents