Unloading the machine from a transport trailer

Rear loading type transport trailer
CX130C – CX130C LC
1. Position the trailer on firm and level ground. Put blocks
to the tires of trailer to prevent trailer from moving.
2. Remove chains, wire ropes, chocks, blocks and other
devices used to secure the machine during road trans-
port.
3. Prepare the loading ramps. If the ramps are included
in the trailer frame, lower them to the ground. If the
ramps are external to the trailer, match them to the
rear edge of the trailer avoiding any bump between
trailer bed and external ramps.
4. Get on the machine and start the engine.
5. Make sure to deactivate the auto idle function and the
auto shut-down function. Press the idle mode button
(1) until any idle icon on the display turns off. Press the
travel mode selector button (2) to select the low travel
speed. The "Turtle" icon appears on the display.
6. Select the H work mode and set the gate lock lever in
forward position.
7.
If the front equipment is installed, operate the arm
and bucket controls so that the arm stands vertical
and the bottom of the bucket is about 20 cm (7.9 in)
above the trailer bed.
NOTICE: Starting from this position, the travel control
levers must be pushed forward to move on the trailer
bed and on the ramps. Confirm the travel control
directions before start moving.
8.
Travel slowly towards the back of the trailer and
stop as reaching the ramps. If the front equipment
is installed, operate boom and arm softly in order
to get the bucket close to the ground ahead of the
ramps. Avoid to fully extend the bucket cylinder to
prevent damaging it due to accidental impacts with
the ground.
9.
Move down on ramps with extreme care while oper-
ating boom and arm softly in order to keep the bucket
close to the ground and so to grant machine stability.
10. Pass through the ramps completely and stop the ma-
chine once it gets on the ground.
5 - TRANSPORT OPERATIONS
5-11
1
SMIL18CEX0768AB
2
SMIL20CEX0037AC