Every 250 Hours; Grease Points (Bucket) - Case CX130C Operator's Manual

Crawler excavator
Hide thumbs Also See for CX130C:
Table of Contents

Advertisement

Every 250 hours

Grease points (Bucket)

Grease the bucket linkage every 250 h.
Lubricant: M
-P
ULTI
URPOSE
NOTE: the bucket linkage shall be lubricated every 10 h if non-genuine grease is used.
Bucket linkage: two grease fittings.
NOTICE: the bucket linkage shall be lubricated every 10 h
if the machine is operated in water or mud.
NOTICE: the bucket linkage shall be lubricated every 10 h
if any attachment other than a bucket is used.
6 - MAINTENANCE
G
E
P
REASE
XTREME
RESSURE AND ANTI
-
NLGI 2.
WEAR
1
SMIL17CEX0150FB
6-24
2
SMIL18CEX0519AA

Advertisement

Table of Contents
loading

Table of Contents