Hyundai HX145LCR Manual page 171

Hide thumbs Also See for HX145LCR:
Table of Contents

Advertisement

5. MAIN RELIEF PRESSURE CHANGE SYSTEM
(2)
Pb1
SWING
ARM
BUCKET
P
T
(1)
(3)
(2)
(4)
SH
c
B e1 D
E
PS
A
Pc3
d1
a
d
PS
b
e
e2
PS
Pd2
Pc2
Pd40 Pd41
Pb3
Pc40
Pc41
Pc42
When the power boost switch on the left control lever is pushed ON, the power boost solenoid valve
is actuated, the discharged oil from the pilot pump flows into Pu port of the main relief valve of main
control valve; then the setting pressure of the main relief valve is raised from 350 kgf/cm
380 kgf/cm
(5400 psi) for increasing the digging power.
2
And even when pressed continuously, it is canceled after 8 seconds.
When the auto power boost function is selected to enable on the cluster, the pressure of the main
relief pressure is automatically increased to 380 kgf/cm
It is operated max 8 seconds.
C6
D6
Pc6
TURNING
JOINT
Pd6
Puo
C5
D5
Pc5
Pd5
DR5
Po5
C4
D4
DR3
Pc41
Pc40
Pd40
V3
Pc3
DR2
Pa21
C2
D2
Pc2
Pd2
DR4
P03
C1
D1
Pc1
Pd1
P
T
TRAVEL
DR0
P0
PS
(1)
(4)
(3)
Pa1
Pd1
Pc1
BOOM
P
T
P1
P1
Dr4
Dr4
T1
T1
(3)
(1)
(2)
(4)
Dr3
Dr3
F
G
H
PS
J
P03
P03
h1
h2
(MCV)
(MCV)
g
h
j
f
Pa5
Pb5
Pb20 Pb21
T
T
P04
Pa20 Pa21
BOOM PRIORITY
EPPR VALVE
OPTION C
(DOZER)
OPTION B
ARM 1
BOOM 2
SWING
TRAVEL
RIGHT
TRAVEL
Ai
STRAIGHT
Pd0
P3
P1
PG(S/Motor)
PG(S/Motor)
P0(MCV)
P0(MCV)
P2
P2
P3
P3
P4
P4
P02(MCV)
P02(MCV)
P5
P5
T5
T5
T2
T2
T3
T3
T4
T4
Pa4
Pa4
Po5
Po5
Pb4
Pb4
P
P
Pu
Pu
(MCV)
(MCV)
(T/Joint)
(T/Joint)
(MCV)
(MCV)
A1
A1
A4
A4
A3
A3
A2
A2
A1
A1
P3
P3
P2
P2
P1
P1
POWER BOOST
SOLENOID VALVE
(5400 psi) as working condition by the MCU.
2
3-10
Pi1(Pump)
Pi2(Pump)
Rs
Pn2
BUCKET
ARM
REGEN
ARM 2
BOOM 1
P2
Dr#, dr#
P(F/CNTL
P(F/CNTL
EPPR)
EPPR)
P1(T/S SOL)
P1(T/S SOL)
Pn1
B5
A5
Pb5
Pa5
P04
B4
Pb4
Pa4
Pc42
Pb3
Pd41
B2
A2
Pb21
DR1
Pb20
Pa20
P02
PS
Patt
B1
A1
Pb1
Pa1
TRAVEL
LEFT
MAIN RELIEF
VALVE
T1
145ZF3HC06
(4980 psi) to
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents