2) 2)
TEST PROCEDURE
TEST PROCEDURE
Test 14 : Check voltage at CN-52 (36)
(1)
(1)
and ground.
①
Prepare 1 piece of thin sharp pin, steel or
copper.
②
Insert prepared pin to rear side of
connectors : One pin to (36) of CN-52.
③
Starting switch ON.
④
Check voltage as figure.
SPEC : Actuator operating : 1~5 V
CN-51
10
9
8
7
6
20
30
40
39
38
37
36
6-58
MCU
PIN
CN-52
5
4
3
2
1
CN-52
Female
11
21
36
34
33
32
31
GROUND
Multimeter
300L6MS16