Hyundai HX145LCR Manual page 689

Hide thumbs Also See for HX145LCR:
Table of Contents

Advertisement

3. TRACK ROLLER
REMOVAL
1)
Loosen tension of the track link.
(1)
Using the work equipment, push up track
(2)
frame on side which is to be removed.
After jack up the machine, set a block
under the unit.
Remove the mounting bolt (1) and draw
(3)
out the track roller (2).
Weight : 35.1 kg (77.4 lb)
Tightening torque : 29.6 3.2 kgf m
2)
INSTALL
Carry out installation in the reverse order
(1)
to removal.
(214 23.1 lbf ft)
8-217
8-217
Frame
Grease
valve
90~110
140Z98UC05
1
2
8-163(1)
8-163(3)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF