3. TRACK ROLLER
REMOVAL
1)
Loosen tension of the track link.
(1)
Using the work equipment, push up track
(2)
frame on side which is to be removed.
After jack up the machine, set a block
under the unit.
Remove the mounting bolt (1) and draw
(3)
out the track roller (2).
Weight : 35.1 kg (77.4 lb)
Tightening torque : 29.6 3.2 kgf m
2)
INSTALL
Carry out installation in the reverse order
(1)
to removal.
(214 23.1 lbf ft)
8-217
8-217
Frame
Grease
valve
90~110
140Z98UC05
1
2
8-163(1)
8-163(3)