EPPR VALVE CHECK PROCEDURE
EPPR VALVE CHECK PROCEDURE
4)
4)
(1)
(1)
Check electric current value at EPPR valve
Check electric current value at EPPR valve
①
Disconnect connector CN-75 from
EPPR valve.
②
Insert the adapter to CN-75 and install
multimeter as figure.
③
Start engine.
④
Set S-mode and cancel auto decel
mode.
⑤
Position the accel dial at 10.
⑥
If rpm display show approx 1750 ± 50
rpm check electric current at bucket
circuit relief position.
⑦
Check electric current at bucket circuit
relief position.
(2)
(2)
Check pressure at EPPR valve
Check pressure at EPPR valve
①
Remove plug and connect pressure
gauge as figure.
·Gauge capacity : 0 to 50 kgf/cm
②
Start engine.
③
Set S-mode and cancel auto decel
mode.
④
Position the accel dial at 10.
⑤
If tachometer show approx 1750 ± 50
rpm check pressure at relief position of
bucket circuit by operating bucket control
lever.
⑥
If pressure is not correct, adjust it.
⑦
After adjust, test the machine.
2
(0 to 725 psi)
5-56
Spec : 100~700 mA
Adapter(P/no.:21Q6-50410)
EPPR valve
Multimeter
CN-75
Main pump
Spec : 2~25 kgf/cm
(30~350 psi)
2
Pressure adjusting
screw locknut
EPPR valve
CN-75
Valve casing
Main pump
Valve casing
145ZF5MS21
Pilot pressure
supply line
145ZF5MS22