2. CARRIER ROLLER
REMOVAL
1)
Loosen tension of the track link.
(1)
Jack up the track link height enough to
(2)
permit carrier roller removal.
Loosen the lock nut (1).
(3)
Tightening torque : 29.7 4.4 kgf m
Open bracket(2) with a screwdriver, push
(4)
out from inside, and remove carrier roller
assembly.
Weight : 20 kg (45 lb)
2)
INSTALL
Carry out installation in the reverse order
(1)
to removal.
(215 31.8 lbf ft)
8-216
8-216
Frame
Jack
Carrier roller
1
2
Grease
valve
8-162(1)
8-162(2)
Carrier
roller
8-162(3)