MTS 2 and MTS 4 Installation, Configuration and Basic Service Manual
Cabinet Installation
■
■
■
■
■
■
■
■
■
■
■
■
■
This section provides procedures for mounting the MTS cabinet within a site.
Cabinet Bracing Considerations
The MTS cabinet is self-supporting. In seismically active areas, additional bracing of the cabinet
could be required. However, the bracing hardware must be locally procured.
6802800U74-N September 2009
■
■
■
■
■
■
■
■
■
■
■
■
■
The free space above the cabinet(s) must be 20 cm at minimum to enable
service access and assure the passive cooling ventilation. Please note that
especially antenna cabling may require additional space. Allow at least 80 cm
of floor space in front of the cabinet(s) to permit access during installation.
Although all maintenance, expansion, cabling, and antenna connections can
be performed from the front or top. The required space towards the wall is
ensured by an integrated "spacer" on back of the cabinet.
The cabinet must be secured to the floor for optimum stability.
There are no specific procedures within this manual for bracing cabinets in active seismic areas.
■
■
■
■
■
■
■
■
■
■
■
■
■
■
Cabinet Installation
■
■
■
■
■
■
4-7